subei.com
域名年龄: 23年5个月20天HTTP/1.1 301 永久重定向 访问时间:2019年09月09日 16:37:02 服务器:Apache/2.4.39 (cPanel) OpenSSL/1.0.2r mod_bwlimited/1.4 Phusion_Passenger/5.3.7 目标网址:http://subei.com/ 缓存控制:max-age=0 过期时间:2019年09月09日 16:37:02 文件大小:225 类型:text/html; charset=iso-8859-1 HTTP/1.1 200 OK 访问时间:2019年09月09日 16:37:02 服务器:Apache/2.4.39 (cPanel) OpenSSL/1.0.2r mod_bwlimited/1.4 Phusion_Passenger/5.3.7 Upgrade: h2,h2c 连接:Upgrade 修改日期:2019年09月03日 14:28:55 接受单位:字节 缓存控制:max-age=0 过期时间:2019年09月09日 16:37:02 动作:Accept-Encoding Content-Encoding: gzip 客户端设定:IE=edge X-Content-Type-Options: nosniff 文件大小:6371 类型:text/html; charset=utf-8 网站编码:utf-8
An ISO 9001:2015 Certified CompanyHomeAbout UsServicesCase StudiesCareerContactWhat Corrosion Does ?Corrosion is the main cause of damage or destruction of the infrastructures, industrial equipment, surfaceand sea transportation facilities, etc. It results in huge financial loss as well as number of other seriousconsequences, e.g., loss of production and a health, safety and environmental hazard (fire, explosion andtoxic release, etc.), in case of sudden failure of an equipment or pipeline, etc.Read MoreContact UsAbout UsNeon and its business partner’s, world class manufacturing facility, is located about 250 km away fromIndia’s financial capital, Mumbai. We have been operating in the Indian market for 35+ years and in theinternational market for 20+ years, providing high quality machinery and adhering (strictly) tointernational standards and guidelines “In quality control & delivery”.Read MoreOur ServicesCorrosion Assessment & Material SelectionSelection of the construction material, for a service component (equipment, pipeline, machinery, etc.),is of highest importance to ensure its integrity, reliability and safety, throughout the designedlife-cycle. We recommend most appropriate and cost effective material, with or without a corrosioncontrol/ mitigation measure, after thorough assessment of corrosion-rate and damage mechanisms in theintended application.Read MoreCorrosion Control & ProtectionBased on qualitative and quantitative assessment of potential corrosion risks, we recommend mosteconomically viable corrosion-control strategy, including corrosion allowance, proper design, coating,cathodic protection, corrosion inhibitor and chemical treatment, corrosion monitoring, etc.Read MoreCondition Assessment & Corrosion AuditCondition assessment is done for individual equipment or pipeline, while corrosion audit is done for the whole facility. Steps include - site visit and inspection; collection of technical data, records and history; interaction with plant personnel; review and analysis; etc., followed by report with preventive/corrective actions or remedial measures. Read More Failure Investigation & Root Cause Analysis This is carried out for individual equipment (or piping) of the operating facility, and involves activities are - component inspection; sample accumulation; collection of technical records and history; feedback from plant personnel; lab testing and characterization; analysis and review; etc., followed by report with identified cause of trouble and future remedies. Read More Review of Design, EPC and Maintenance Documents Peer review of concept, FEED, engineering, construction, licensor and major maintenance (or modification) documentation to ensure adequacy and suitability of used material and metallurgy, corrosion-control strategies and technologies, corrosion/risk- assessment and management, etc., and adherence to companies standards, practices and specific requirements. Read More Corrosion-Risk & Integrity-Management Support
© 2010 - 2020 网站综合信息查询 同IP网站查询 相关类似网站查询 网站备案查询网站地图 最新查询 最近更新 优秀网站 热门网站 全部网站 同IP查询 备案查询
2025-05-19 14:18, Process in 0.0069 second.