eqtec.com
域名年龄: 24年1个月26天HTTP/1.1 302 Found 访问时间:2016年09月21日 06:56:59 语言环境:PHP/5.3.29 目标网址:http://www.eqtec.es/en/ 动作:Accept-Encoding Content-Encoding: gzip 文件大小:20 连接:关闭 类型:text/html; charset=utf-8 HTTP/1.1 301 永久重定向 访问时间:2016年09月21日 06:56:59 目标网址:http://www.eqtec.es/en 动作:Accept-Encoding Content-Encoding: gzip 文件大小:189 连接:关闭 类型:text/html; charset=iso-8859-1 HTTP/1.1 200 OK 访问时间:2016年09月21日 06:56:59 语言环境:PHP/5.3.29 动作:Accept-Encoding Content-Encoding: gzip 文件大小:5861 连接:关闭 类型:text/html; charset=utf-8 网站编码:utf-8
Join us on Join our team Customer segments Español English Home Eqtec Business areas Projects News Contact EPC project Projects based on efficient, reliable and sustainable solutions Specialists in power generation projects More than 100 MWe of power installed in multi-sector power projects both nationally and internationally Development of Automation and Control Power plant monitoring and control system EQTEC Monitoring Platform (EMP). Cogeneration and Renewable Energy Plants We increase energy efficiency and improve the competitiveness of our customers Leaders in Waste Gasification Technology.Proprietary Gasification Technology – EQTEC Gasifier Technology (EGT) Specialists in micro-cogeneration modules More than 100 modules supplied EKM (Eqtec Kinetic Model) R & D thermochemical gasification technology Eqtec Gasifier Technology (EGT) Eqtec Kinetic Model (EKM) Eqtec Monitoring Platform (EMP) Our business areas News 27/07/2016 EQTEC IBERIA JOINS A EUROPEAN CONSORTIUM TO BUILD A SYNTHETIC NATURAL GAS PLANT IN POLAND Eqtec Iberia will provide Polygen Project with its own exclusive gasification technology, in order to produce synthetic natural gas, which allows it to be replaced by natural gas in city supply and … Saved under: Noticias Eqtec 12/04/2016 NEW COGENERATION MAINTENANCE CONTRACT EQTEC HAS SIGNED THE MAINTEINANCE CONTRACT CORRESPONDING TO TWO COGENERATION MODULES INSTALLED IN THE HORTA & TRIANGLE OFFICE BUILDINGS OF THE COMPANY “EMPRESA TRANSPORTS DE BARCELONA S.A (TMB)” Saved under: Noticias Eqtec 10/03/2016 FINALIZATION OF THE CONSTRUCTION OF 1ST STAGE OF THE 1.2MW FOREST RESIDUES INTEGRATED GASIFICATION COGENERATION PLANT IN CROATIA. EQTEC finished in early March the 1.2MW forest residues integrated gasification cogeneration plant construction 1st stage. The assembly of the structure of the gasification plant has been completed … Saved under: Noticias Eqtec 26/12/2015 Start of Construction of a 1.2MW forest residues integrated gasification cogeneration plant. EQTEC has started the construction of the gasification plant of forest waste in the town of Belišće (Croatia) for SENSE ESCO, energy services company. Saved under: Noticias Eqtec © Eqtec 2013 - Legal Notice c/ Rosa Sensat 9-11, 5th floor - 08005 BARCELONA – (SPAIN) Tel. +34-935 739 981 | Fax +34-935 624 735 | (Necessites javascript per veure aquest correu-e) Eqtec forma parte de EBIOSS Energy Designed by +
© 2010 - 2020 网站综合信息查询 同IP网站查询 相关类似网站查询 网站备案查询网站地图 最新查询 最近更新 优秀网站 热门网站 全部网站 同IP查询 备案查询
2026-01-08 21:41, Process in 0.0037 second.